« November 2005 »
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
You are not logged in. Log in
Entries by Topic
All topics  «
Blog Tools
Edit your Blog
Build a Blog
RSS Feed
View Profile
Bike Build Blog
Saturday, 19 November 2005
Head Tube Tacked
Now Playing: MIA & Diplo - Piarcy Funds Terrorism Vol. 1
I tacked up the head tube and sockets last night. Now I'm going to transfer the pattern I carved into the seat tube lug onto the blank sockets. Then the filing begins.

To transfer the pattern I'm going to wrap a post-it around the lug, cut it to match the edge, then wrap it around the blank socket and use a sharpie to mark the area that needs to be cut out. I don't need the lugs to be exact copies of each other but I'd like to at least get the proportions similar.


Posted by Marc at 12:45 PM PST

View Latest Entries