Now Playing: Uptown Felaz - Double Standard
I did some more shaping on the seat lug and it's ready to go. I also started on the head tube section. This is going to semi-lugged, with sockets for the top and down tubes only. The sockets will be filleted directly to the head tube. Aesthetically it looks cool, but it also saves me a from having to cut and file a lot of metal.
Here's the tubing mitered and ready to be tacked so that I can cut and shape the sockets.
Posted by Marc
at 3:57 PM PST
Updated: Saturday, 12 November 2005 4:25 PM PST